General
- Plot 5, Hotel Bristol, Belgrade, Serbia
- Investor: Eagle Hills
- Building area: cca 12.000 sqm
- Partner: Termoprojekt d.o.o., Belgade, Serbia
Highlights
- Transformer substation
- 1 transformers, 1.6 MVA installed power
- DG set: cca 0.7 MVA
Our work
Design for construction permit:
- Transformer substations (Siemens)
- LV design
- Main MV and LV power supply – busbar trunking systems, cables and cable trays
- Lighting installations (Philips, Zumtobel, Cooper)
- Small power installations (Legrand)
- Motor drive installations (HVAC)
- Lightning installations
- BMS
- RMS
- ELV installations
- Fire alarm system (Siemens)
- CCTV (video surveillance) system (Axis)
- Access control system
- Door lock system
- Structured Cabling System
- Wireless data transfer WIFI
- Public address